Utilities &
Infrastructure.
GPR utility mapping, subsurface void detection, pre-construction clearance, and asset-integrity inspection across the Kingdom's power, water, transport, and telecoms corridors.

Subsurface clearance and corridor integrity.
The Kingdom's utility corridors — power transmission, water mains, telecoms backhaul, transport infrastructure — span thousands of kilometres of arid terrain. Striking unknown buried infrastructure during expansion or maintenance carries compound cost: schedule slip, equipment damage, utility outage, safety incident.
GPR pre-clears excavation zones at high resolution. LiDAR + photogrammetry document existing assets to engineering tolerance. Caged inspection drones survey confined spaces — substations, tanks, conduits — without sending personnel into hazardous environments.
All outputs ship in GIS-ready formats with confidence-graded interpretation — direct input to client asset-management and BIM platforms.
What we solve.
Buried utility strike risk
GPR pre-clearance reduces strike risk before earthmoving begins.
Corridor as-built
LiDAR + photogrammetry document existing infrastructure at engineering tolerance.
Confined-space inspection
Caged drones inspect substations, tanks, and conduits with zero human entry.
Subsurface voids
GPR detects sinkholes, abandoned tunnels, and karst before they become incidents.
Power corridor monitoring
LiDAR + thermal capture document vegetation encroachment and asset health.
Regulatory compliance
Audit-traceable outputs aligned to KSA utility-sector reporting standards.
Capabilities for this sector.
Pre-construction clearance.
Substation + tank + conduit.
Corridor as-built.
Route design terrain.
Facility exterior cleaning.
Foundation site geology.

Corridor baseline + vegetation clearance
Centimetre-grade corridor capture with vegetation encroachment mapping — direct input to maintenance scheduling and risk-based asset management.
Clear your corridor.
Send us your corridor polygon and inspection objective. We respond with survey plan and timeline within 48 hours.