Program Briefing·FN-003··8 min read
What 120 km² of NEOM Terrain Capture Actually Looks Like
BIM-ready in two weeks. Centimeter cut/fill volumetrics. As-built deviation analysis against design. The Trojena program compressed what would have been two field seasons into a 32-day window — here's the workflow that made it possible, and the deliverable formats that landed in the client's existing GIS.
Full article coming soon.
